Double vanity installation
Two sinks, more storage and no more waiting for the sink in the morning.
Book a design consultation See finished projects- 3D render before work starts
- One project contact
- Licensed and insured
Two sinks, more storage and no more waiting for the sink in the morning.
Book a design consultation See finished projects
Every project is planned with you, drawn in 3D and quoted in writing. Here is what is usually included; we tailor the scope to your home.
Drag the handle to compare the room before and after the work.
Two sinks need enough width for elbow room and counter space.
A second drain and supply are run inside the wall.
Sconces beside each mirror light faces evenly.
Four stages, the same for a single upgrade as for a whole-floor renovation. You approve each one before the next begins.
We meet at your home or in the showroom, measure the space and talk through budget and how you use the room.
Layout, cabinets and finishes come together in a 3D model you can walk through and change.
Permits, demolition, rough-ins and finish work run on a schedule you receive in writing.
We check every detail with you, finish the punch list and hand over care guides and your warranty.
Anything else, ask during your consultation or send us a message.
Most primary bathrooms are. We measure and show you in 3D.
For the first sink, yes. The second needs new lines.
Quartz is popular for its stain resistance; marble and quartzite suit lighter use.
Yes. We apply for the permits your project needs and schedule every inspection.
Send a few photos and tell us what you have in mind. We reply within one business day to set up your consultation.
Book a design consultationOr call 732-359-7906