Tub-to-shower conversions

Replace a bathtub you never use with a walk-in shower that fits the same space.

Book a design consultation See finished projects
  • 3D render before work starts
  • One project contact
  • Licensed and insured
Walk-in shower built where a bathtub used to be

What’s included

Every project is planned with you, drawn in 3D and quoted in writing. Here is what is usually included; we tailor the scope to your home.

  • Tub removal and disposal
  • A new shower pan or tiled floor
  • Waterproofing and tiled walls
  • Shower valve, head and handheld
  • Glass door or panel

Ways to do it

Same footprint

The shower fits exactly where the tub was, which keeps costs down.

Talk it through with a designer
Shower fitted exactly into a former bathtub alcove

Wider shower

Borrow space from the vanity or a closet.

Talk it through with a designer
Widened walk-in shower with a tiled bench

Accessible version

A low or no curb, a bench and grab bars.

Talk it through with a designer
Accessible shower with a low entry, a fold-down teak seat and grab bars that double as towel bars

Before and after

Drag the handle to compare the room before and after the work.

Before the remodel: a dated 1990s bathroom with beige tile, a fiberglass tub with a plastic shower curtain
Walk-in shower built where a bathtub used to be

Good to know before you start

Resale

If it is the only tub in the house, check what buyers expect locally.

Valve position

We move the controls so you can turn the water on without getting wet.

Niches

Recessed shelves are easiest to add now, while the wall is open.

How a project runs

Four stages, the same for a single upgrade as for a whole-floor renovation. You approve each one before the next begins.

  1. Consultation

    We meet at your home or in the showroom, measure the space and talk through budget and how you use the room.

    • BringPhotos of rooms you like and a rough budget
    • You leave withA clear scope and a budget range
  2. Design and 3D rendering

    Layout, cabinets and finishes come together in a 3D model you can walk through and change.

    • IncludesSpace planning, material and finish selection
    • You leave withApproved 3D renders and an itemized estimate
  3. Construction

    Permits, demolition, rough-ins and finish work run on a schedule you receive in writing.

    • IncludesPermits, inspections, dust protection and daily clean-up
    • You getOne project contact and an update every week
  4. Walkthrough

    We check every detail with you, finish the punch list and hand over care guides and your warranty.

    • IncludesFinal inspection with you and the punch list
    • You getCare guides for every surface and your warranty
Start with a consultation

Questions we hear first

Anything else, ask during your consultation or send us a message.

Often around one to two weeks, including tile and glass.

Rarely. The tub edge sits under it, so the walls are usually retiled.

No, if we add niches and a bench.

Yes. We apply for the permits your project needs and schedule every inspection.

More bathroom services

Freestanding Tub Installation

A sculptural soaking tub with a floor-mounted or wall-mounted filler, placed where it looks best in the room.

Wet Room Design

A fully waterproofed bathroom where the shower is part of the room: no tray, no curb and one continuous floor.

Double Vanity Installation

Two sinks, more storage and no more waiting for the sink in the morning.

Plan it with a designer

Send a few photos and tell us what you have in mind. We reply within one business day to set up your consultation.

Book a design consultation

Or call 732-359-7906