Stone on existing cabinets
Quartz, granite or quartzite on sound cabinet boxes.
Talk it through with a designer
New countertops on your existing cabinets, without a full remodel.
Book a design consultation See finished projectsEvery project is planned with you, drawn in 3D and quoted in writing. Here is what is usually included; we tailor the scope to your home.
Drag the handle to compare the room before and after the work.
Removing old counters can damage a tile backsplash. Plan for it.
Stone needs level, solid boxes. We reinforce them if needed.
The sink is out of use between removal and installation, usually a few days.
Four stages, the same for a single upgrade as for a whole-floor renovation. You approve each one before the next begins.
We meet at your home or in the showroom, measure the space and talk through budget and how you use the room.
Layout, cabinets and finishes come together in a 3D model you can walk through and change.
Permits, demolition, rough-ins and finish work run on a schedule you receive in writing.
We check every detail with you, finish the punch list and hand over care guides and your warranty.
Anything else, ask during your consultation or send us a message.
Yes, if the cabinets are level and strong.
Usually a few days between removal and installation.
Sometimes. We will tell you before removal.
Yes. We apply for the permits your project needs and schedule every inspection.
Send a few photos and tell us what you have in mind. We reply within one business day to set up your consultation.
Book a design consultationOr call 732-359-7906